Flowscreed Ltd returns to Bury St Edmunds Suffolk
Back to Bury to finish off the last office block for CMC.
Preparation was completed by our star employee Luke who installed 400m2 of 1200g polythene Damp Proof Membrane, 400m2 of EPS 100 insulation, 400m2 of 500g slip membrane and 150m perimeter edging in just 2.5 days.
Including a site survey ready for Friday flow screed pour.
Well done Luke.